Show info
|
|
Supply Chain Management |
Description
Proficiency at starting manufacturing jobs remotely. Without this skill, one can only start jobs within the solar system where one is located. Each level increases the distance at which manufacturing jobs can be started. Level 1 allows for jobs at a range within 5 jumps, and each subsequent level adds 5 more jumps to the range, with a maximum of a 25 jump range. |
ESI average price data (updated: ) |
Adjusted Price
|
Average Price
|
8,318,259.60 | 7,500,000.00 |
| |
Mass: | 0 kg | Volume (unpacked): | 0 m3 | Cargohold: | 0.00 m3 | Baseprice: | 7,500,000.00 ISK | Portion size: | 1 item | Primary attribute
| 166 | Secondary attribute
| 165 | Primary Skill required
| Mass Production | Training time multiplier
| 3 | Level
| 0 |
|